Engineering has reviewed the plans for the Oleander Commons project submitted December 9, 2019 and offer the attached comments.
The proposed FDC locations do not comply with the following:
- A hydrant must be within 150' of the FDC (measured as the truck drives for practical use). It appears none of the FDC's meet this requirement unless I missed a hydrant or two.
- FDC's must be within 40' of fire apparatus placement. Buildings 2 & 3 are not in compliance.