Submittal Comments for Site Plan Version 4 at North Market Storage Expansion (20190663251)
Show all Submittals
Comment Number:
30444
Created By:
Mitesh Baxi
4/2/2020
Revised By:
Mitesh Baxi
4/2/2020
Title/Company:
Senior Traffic Engineering Technician / City of Wilmington
Phone/Email:
(910) 341-7893 / mitesh.baxi@wilmingtonnc.gov
Comment Attachment:
0402020_North_Market_Storage_Expansion_Rev4.pdf
NORTH MARKET STORAGE EXPANSION [TRC Plan Review #4] TECHNICAL STANDARDS: Site plan shows proposed sidewalk in front of this property. An ADA ramp at the corner of street type driveway abutting the eastern and western boundary of the property are required and shall be installed as per City/NCDOT standards. This was missed to comment on initially, but it will be required. A separate revision will not be required and this change can be made with the final submittal. If these ADA ramps are to be constructed by others, please label accordingly. Please let me know if you have any questions.
Comment Number:
30447
Created By:
Nicole D. Smith
4/3/2020
Revised By:
Nicole D. Smith
4/3/2020
Title/Company:
Associate Planner / City of Wilmington
Phone/Email:
910-341-1611 / nicole.smith@wilmingtonnc.gov
Comment Attachment:
No further comments from Planning.
Comment Number:
30448
Created By:
Bill McDow
4/7/2020
Revised By:
Bill McDow
4/7/2020
Title/Company:
Associate Transportation Planner / City of Wilmington
Phone/Email:
910-341-7819 / bill.mcdow@wilmingtonnc.gov
Comment Attachment:
North Market Street Storage Technical Standards: Sight Distance, Sidewalks, Access 1. If Payment in Lieu for Sidewalk has been submitted, you may place a note on the plan that sidewalk will be installed by others. 2. The proposed Variance for the 500'/800' rule was tentatively approved by Engineering. 3. Proposed Street Trees are at the edge of future NCDOT ROW and are located in the 20'X70' Sight Distance Triangle. The present street tree location may require additional evaluation when the NCDOT ROW is moved for the Market Street Median Project and the distance to the travel lane is reduced. 4. No Further Comments.