Engineering Plan Review has completed its review of the plans submitted for the above referenced project on 11/12/14 and we offer the following comments:
- which basin does the front of (nearest Andrews Reach Loop) Dovecote Ave. drain to?
- Note 2 of the Stormwater Notes on Sheet 2 references a Pond 2 and the stormwater clacs. reference a Pond 1, however, the ponds have not been labeled as such on the plans.
- Please add a detail of the retrofitted outlet structure for the existing detention basin.
- in the Pre & Post Development calcs. the drainage area used is 5.48 acres. However, the project areas is only 2.28 acres. Please clarify. If this drainage area is attributed to an area that is part of the existing detention basin drainage area then please provide an overall drainage area map that defines these larger drainage areas.