Nothing further from Planning.
Engineering is awaiting a Major Construction revision submittal which includes a $500 review fee. This package shall include wet pond reduction for tree save with corresponding calculations, updated cross connection median for tree save, stamped concrete for entrance, updated MUP along Mitary Cut-off from concrete to asphalt, removal of MUP elevated sidewalk, and relocated wetpond outfall (sand filter). Please include any other field revisions which may have not been listed above.