- Tree mitigation calulations are not correct. Mitigation is calculated per tree, not cummulatively, then the total number of trees required is added up.
Significant trees. The total number of replacement trees shall be determined by multiplying the total DBH of the removed significant trees by two (2) times the percentage for the type of tree in Table IV and dividing by three (3).
- Tree credit calculation should be done by calculating the credit per tree preserved. This will result in a more credits than the method currently employed.