SUMMERWALK PHASE 1- [TRC Plan Review #7]
*Please resolve all comments and show changes on final plan set, prior to signature.
* The Overall Greenville Loop Road Roadway Improvement Plan Sheets appear to have survey points on the plan, which obscure the plan sheets for the EX. EOP and Prop. EOP.
TECHNICAL STANDARDS – NEW ROADS:
TECHNICAL STANDARDS – ACCESS (driveway, sidewalk, and sight distance):
16. The pavement marking for the Crosswalk are not part of the On-Road Bike Lane, therefore, the Crosswalk must end on the site and not on Greenville Loop Road. For the start of the Bike Lane on Greenville Loop Road, please begin the Bike Lane after the end of the street corner Radius at Tamarisk Lane.
17. Show Wheel Chair Ramps and Truncated Dome Mats for all road crossings and street corners.
18. No Further Comments.