Please address the following:
- Please show all FDC locations on the plan. (keep in mind Phase 2 & 3 multifamily will also trigger a sprinkler system)
- FDC must be on the front of the building unless otherwise approved.
- Standpipe(s) will be required because the floor elevation is greater than 30' above the lowest level of fire department vehicle access.
- Fire apparatus access road is greater than 150’. An approved fire apparatus turnaround must be provided. The parking lot to the south appears to be approx. 200’ in length.
- The type of Building Construction according to the International Building Code must be present on the plans. (Preferably the site data table)
Please add the following Fire & Life Safety Notes:
- Contractor shall maintain an all-weather access for emergency vehicles at all times during construction
- New hydrants must be brought into service prior to combustible materials delivered to the job site
- A hydrant must be within 150' of the FDC (measured as the truck drives for practical use)
- FDC must be within 40' of fire apparatus placement
- Landscaping or parking cannot block or impede the FDC or fire hydrants. A 3-foot clear space shall be maintained around the circumference of the hydrant and FDC
- Additional fire protection and/or accessibility requirements may be required due to any special circumstances concerning the project.
- Private Underground Fire Lines require a separate underground fire line permit from the Wilmington Fire and Life Safety Division 910-343-0696
- Contractor shall submit a Radio Signal Strength Study for all commercial buildings that demonstrates that existing emergency responder radio signal levels meet the requirements of Section 510 of the 2018 NC Fire Code.
- All isolation valves within the “Hot Box” and between the “Hot Box” and the riser room, must be electrically supervised.
Engineering has reviewed the TRC submittal for the Cape Fear Solar Systems project and offers the following attached comments.