Please address the following comments:
- Fire apparatus access road is greater than 150’. An approved fire apparatus turnaround must be provided. It appears both phases will require a turnaround.
- The type of Building Construction according to the International Building Code must be present on the plans. (Preferably the site data table)
Please add the following Fire & Life Safety Note to the general notes section due to the 2018 NC Fire Code Change:
- Contractor shall submit a Radio Signal Strength Study for all commercial buildings that demonstrates that existing emergency responder radio signal levels meet the requirements of Section 510 of the 2018 NC Fire Code.