See attached for comments.
Your plan notes lead me to believe there is a sprinkler system. If so please illustrate the FDC location on the site plan. Also, if there is no sprinkler system please show a hydrant that meets the 300 ft. requirement for commercial buildings.
Address the following comments:
- Show all FDC locations on the plan.
- FDC must be on the front of the building unless otherwise approved.
- Hydrant must be within 300’ of the building(s), measured as the truck drives (Commercial)
- The type of Building Construction according to the International Building Code must be present on the plans. (Preferably the site data table)
Add the following FIRE notes:
- Additional fire protection and/or accessibility requirements may be required due to any special circumstances concerning the project.
- Contractor shall submit a Radio Signal Strength Study for all commercial buildings that demonstrates that existing emergency responder radio signal levels meet the requirements of Section 510 of the 2018 NC Fire Code.
- All isolation valves within the “Hot Box” and between the “Hot Box” and the riser room, must be electrically supervised. (If sprinkler system present)
Engineering has reviewed the TRC submittal for the Masonboro Station Expansion project and offers the following attached comments.