Please show and label the FDC locations on the plan.
Also, please add the following standard notes for a sprinkled building to the Fire& Life Safety Notes section:
- New hydrants must be brought into service prior to combustible materials delivered to the job site
- Hydrant must be within 150' of the FDC (measured as the truck drives for practical use)
- FDC must be within 40' of fire apparatus placement
- All isolation valves within the "Hot Box" shall be electrically supervised. Please work closely with your fire sprinkler and alarm installer in regards to running wire for tamper switch.